Loading Events

« All Events

  • This event has passed.

STEAM POWER PLANT LEVEL 2 (BATCH#3)

October 7 @ 08:00 - October 11 @ 17:00 UTC+7

OVERVIEW
This training suits for someone who has experienced working in level 1 category of Steam Power Plant operation. The trainees will get understanding about Steam Power Plant main equipment operation such as boiler system , turbine system and generator system. The trainees will learn the Steam Power Plant main equipment operation, include the main equipment design and construction philosophy, protective device equipment and operation parameter limits.

OBJECTIVE
On completion of this training, the trainees will have a comprehensive understanding of the main equipment and auxiliaries’ operation, with a fully awareness to operating parameters limitation. By this training the trainees will more aware to each equipment function and parameters limitation relating to main equipment operation. This course will enhance the operator knowledge, and suitable as preparation to the level 2 competency auditing programme.

CONTENT
BOILER OPERATION

  1. Boiler construction
    • Boiler pressure part
    • Air combustion and exhaust gas system
    • Fuel burning equipment
    • Boiler control system
  2. Fuel, combustion air & boiler water
    • Fuel
    • Combustion air
    • Boiler water
  3. Boiler Operation
    • Start‐up, on load & shut down operating procedure
    • Kinds of attention during operation
    • Protection equipment, alarms and trips
    • Boiler operating hazard

TURBINE OPERATION

  1. Turbine working principle
    • Conversion heat energy to mechanical energy
    • Impulse, Reaction and Multistage steam turbine
  2. Turbine construction
    • Turbine rotor and turbine stator
  3. Turbine Auxiliaries
    • Lube and hydraulic oil system
    • Governor system
    • Sealing & gland system
    • Turbine protective device
  4. Turbine operation
    • Start‐up preparation
    • Start‐up
    • Synchronize & loading
    • Stopping and standby

CERTIFICATION

  • Certificate of Attendance (Public Training)

Details

Start:
October 7 @ 08:00
End:
October 11 @ 17:00
Event Categories:
, , ,
Website:
http://smartgate.co.id/events/steam-power-plant-level-2-batch2/

Venue

JAKARTA / TBC
JAKARTA, Indonesia
Phone:
+62 812 9800 0202
Website:
http://smartgate.co.id

Organizer

SMARTGATE
Phone:
+62 812 9800 0202
Email:
info@smartgate.co.id
Website:
http://smartgate.co.id