Loading Events

« All Events

  • This event has passed.

ELECTRICAL INSTALLATION IN STEAM POWER STATIONS (BATCH#3)

14/10/2019 @ 08:00 - 17/10/2019 @ 17:00 WIB

OVERVIEW
At the current time and in the next five years it is anticipated the role of steam power stations, coal burning plants, will be still dominating in the electrical energy production in Indonesia (around 60%). Therefore, training for personnel who operate the plants is essentials.

OBJECTIVE
The training objective is to give knowledge for the personnel in steam power stations to be able to operate the electric Installation properly. It is necessary because the electric installation in a steam power stations is relatively complicated.

CONTENT

  1. Overview of the operation in a steam power station
    • Steam circuit and water circuit
    • Coal burning circuit and exhaust gas
    • Main power circuit from the generator to the system
  2. Electrical circuit of the generator
    • Construction and operation of a synchronous generator
    • Excitation circuit and voltage regulation
    • Synchronizing to the main system
    • Regulating of real power and reactive power
    • Cooling system of the generator
  3. Step up transformer
    • Function of the step‐up transformer
    • Winding connection of the step‐up transformer
    • Circuit breaker of the step‐up transformer
  4. Auxiliary Transformer
    • Electrical circuit of the auxiliary transformer
    • Load of the auxiliary transformer
    • System protection for the load of the auxiliary transformer
  5. Startup transformer
    • Capacity and function of the startup transformer
    • Procedure for startup
  6. Essential motors
    • Motor for cooling water pump
    • Motor for condensate pump
    • Motor for boiler feed pump
    • Motor for coal pulverizer
    • Motor for coal conveyor
    • Motor for feeding coal burners
    • Motor for forced draft fan
    • Motor for induce (sedot) draft fan
  7. Water treatment plant
  8. Electric power circuit of the steam power station
  9. Switchyard of the steam power station
  10. Electric Precipitator
  11. Cathodic protection
  12. Startup procedure of a steam power station
  13. System control of a steam power station
  14. System protection of a steam power station

PREREQUISITES

Participants should be undergraduate electric power engineer with 2 years experience in operation and maintenance.  But any experienced engineer who has the same level of knowladge and experiance are welcome.

CERTIFICATION

  • Certificate of Attendance (Public Training)

Details

Start:
14/10/2019 @ 08:00 WIB
End:
17/10/2019 @ 17:00 WIB
Event Categories:
, , ,

Venue

JAKARTA / TBC
JAKARTA, Indonesia
Phone
+62 812 9800 0202
View Venue Website

Organizer

SMARTGATE
Phone
+62 812 9800 0202
Email
info@smartgate.co.id
View Organizer Website
Butuh Bantuan?
1