BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//SMARTGATE - ECPv6.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://smartgate.co.id
X-WR-CALDESC:Events for SMARTGATE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Jakarta
BEGIN:STANDARD
TZOFFSETFROM:+0700
TZOFFSETTO:+0700
TZNAME:WIB
DTSTART:20180101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Jakarta:20190128T080000
DTEND;TZID=Asia/Jakarta:20190201T170000
DTSTAMP:20260516T082501
CREATED:20190813T025415Z
LAST-MODIFIED:20190813T025415Z
UID:2326-1548662400-1549040400@smartgate.co.id
SUMMARY:STEAM POWER PLANT LEVEL 2 (BATCH #1)
DESCRIPTION:OVERVIEW\nThis training suits for someone who has experienced working in level 1 category of Steam Power Plant operation. The trainees will get understanding about Steam Power Plant main equipment operation such as boiler system \, turbine system and generator system. The trainees will learn the Steam Power Plant main equipment operation\, include the main equipment design and construction philosophy\, protective device equipment and operation parameter limits. \nOBJECTIVE\nOn completion of this training\, the trainees will have a comprehensive understanding of the main equipment and auxiliaries’ operation\, with a fully awareness to operating parameters limitation. By this training the trainees will more aware to each equipment function and parameters limitation relating to main equipment operation. This course will enhance the operator knowledge\, and suitable as preparation to the level 2 competency auditing programme. \nCONTENT\nBOILER OPERATION \n\nBoiler construction\n\nBoiler pressure part\nAir combustion and exhaust gas system\nFuel burning equipment\nBoiler control system\n\n\nFuel\, combustion air & boiler water\n\nFuel\nCombustion air\nBoiler water\n\n\nBoiler Operation\n\nStart‐up\, on load & shut down operating procedure\nKinds of attention during operation\nProtection equipment\, alarms and trips\nBoiler operating hazard\n\n\n\nTURBINE OPERATION \n\nTurbine working principle\n\nConversion heat energy to mechanical energy\nImpulse\, Reaction and Multistage steam turbine\n\n\nTurbine construction\n\nTurbine rotor and turbine stator\n\n\nTurbine Auxiliaries\n\nLube and hydraulic oil system\nGovernor system\nSealing & gland system\nTurbine protective device\n\n\nTurbine operation\n\nStart‐up preparation\nStart‐up\nSynchronize & loading\nStopping and standby\n\n\n\nCERTIFICATION \n\nCertificate of Attendance (Public Training)
URL:https://smartgate.co.id/events/steam-power-plant-level-2-batch-1/
LOCATION:JAKARTA / TBC\, JAKARTA\, Indonesia
CATEGORIES:CERTIFICATION,COURSES,EVENTS,SERVICES
ORGANIZER;CN="SMARTGATE":MAILTO:info@smartgate.co.id
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Asia/Jakarta:20190130T080000
DTEND;TZID=Asia/Jakarta:20190201T170000
DTSTAMP:20260516T082501
CREATED:20190813T030047Z
LAST-MODIFIED:20190813T030049Z
UID:2339-1548835200-1549040400@smartgate.co.id
SUMMARY:TRANSFORMER PROTECTION (BATCH #1)
DESCRIPTION:OVERVIEW\nUntuk dapat menyalurkan energi listrik dalam jumlah besar dan menempuh jarak yang jauh diperlukan saluran tegangan tinggi. Di ujung-ujung saluran tegangan tinggi di dapat transformator yang berfungsi menaikan tegangan dan menurunkan tegangan. Kursus ini akan membahas masalah proteksi dari transformator penaik tegangan dan transformator penurun tegangan. Saluran tegangan tinggi yang menghubungkan 2 (Dua) transformator ini umumnya melalui daerah terbuka yang rawan samberan petir\, sehingga banyak mengalami gangguan. Sistem proteksi generator harus bisa melindungi transformator terhadap gangguan-gangguan ini agar tidak mengalami kerusakan. \nOBJECTIVE\nKursus ini bertujuan untuk memberi pembekalan kepada operator pusat listrik tempat trafo penaik tegangan dan juga operator gardu induk tempat trafo penurun tegangan memahami fungsi dari sistem proteksi transformator\, sehingga tahu langkah-langkah operasional yang harus dilakukan apabila terjadi gangguan yang menyebabkan sistem proteksi transformator bekerja. \nCONTENT \n\nKonstruksi dan fungsi transformator\nBagian-bagian utama dari transformator\nRangkaian pengganti dari transformator\nProteksi dari transformator\, meliputi:\n\nProteksi arus lebih\nProteksi terhadap arus gangguan hubung tanah\nProteksi diferensial\nProteksi hubung tanah terbatas\nProteksi suhu tinggi pada kumparan\nProteksi terhadap kenaikan tekanan mendadak (sudden pressure)\nProteksi terhadap adanya hubung singkat dalam kumparan (relay bucholz)\n\n\nOn load tap changer:\n\nFungsi dan prinsip kerja on load tap changer\nSistem kontrol dari on load tap changer\n\n\nAnalisa kerusakan transformator\n\nCERTIFICATION \n\nCertificate of Attendance (Public Training)
URL:https://smartgate.co.id/events/transformer-protection-batch-1/
LOCATION:JAKARTA / TBC\, JAKARTA\, Indonesia
CATEGORIES:CERTIFICATION,COURSES,EVENTS,SERVICES
ORGANIZER;CN="SMARTGATE":MAILTO:info@smartgate.co.id
END:VEVENT
END:VCALENDAR