BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//SMARTGATE - ECPv6.15.13.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://smartgate.co.id
X-WR-CALDESC:Events for SMARTGATE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Jakarta
BEGIN:STANDARD
TZOFFSETFROM:+0700
TZOFFSETTO:+0700
TZNAME:WIB
DTSTART:20180101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Jakarta:20191014T080000
DTEND;TZID=Asia/Jakarta:20191017T170000
DTSTAMP:20260411T142859
CREATED:20190813T032832Z
LAST-MODIFIED:20190813T032832Z
UID:2412-1571040000-1571331600@smartgate.co.id
SUMMARY:ELECTRICAL INSTALLATION IN STEAM POWER STATIONS (BATCH#3)
DESCRIPTION:OVERVIEW\nAt the current time and in the next five years it is anticipated the role of steam power stations\, coal burning plants\, will be still dominating in the electrical energy production in Indonesia (around 60%). Therefore\, training for personnel who operate the plants is essentials. \nOBJECTIVE\nThe training objective is to give knowledge for the personnel in steam power stations to be able to operate the electric Installation properly. It is necessary because the electric installation in a steam power stations is relatively complicated. \nCONTENT \n\nOverview of the operation in a steam power station\n\nSteam circuit and water circuit\nCoal burning circuit and exhaust gas\nMain power circuit from the generator to the system\n\n\nElectrical circuit of the generator\n\nConstruction and operation of a synchronous generator\nExcitation circuit and voltage regulation\nSynchronizing to the main system\nRegulating of real power and reactive power\nCooling system of the generator\n\n\nStep up transformer\n\nFunction of the step‐up transformer\nWinding connection of the step‐up transformer\nCircuit breaker of the step‐up transformer\n\n\nAuxiliary Transformer\n\nElectrical circuit of the auxiliary transformer\nLoad of the auxiliary transformer\nSystem protection for the load of the auxiliary transformer\n\n\nStartup transformer\n\nCapacity and function of the startup transformer\nProcedure for startup\n\n\nEssential motors\n\nMotor for cooling water pump\nMotor for condensate pump\nMotor for boiler feed pump\nMotor for coal pulverizer\nMotor for coal conveyor\nMotor for feeding coal burners\nMotor for forced draft fan\nMotor for induce (sedot) draft fan\n\n\nWater treatment plant\nElectric power circuit of the steam power station\nSwitchyard of the steam power station\nElectric Precipitator\nCathodic protection\nStartup procedure of a steam power station\nSystem control of a steam power station\nSystem protection of a steam power station\n\nPREREQUISITES \nParticipants should be undergraduate electric power engineer with 2 years experience in operation and maintenance.  But any experienced engineer who has the same level of knowladge and experiance are welcome. \nCERTIFICATION \n\nCertificate of Attendance (Public Training)
URL:https://smartgate.co.id/events/electrical-installation-in-steam-power-stations-batch3/
LOCATION:JAKARTA / TBC\, JAKARTA\, Indonesia
CATEGORIES:CERTIFICATION,COURSES,EVENTS,SERVICES
ORGANIZER;CN="SMARTGATE":MAILTO:info@smartgate.co.id
END:VEVENT
END:VCALENDAR